项目详细信息
技能
Cost
低于$ 50
估计标签
1 day
梅森·马克·麦卡洛(Mason Mark McCullougHomeHomeh)帮助房主修复其石板入口。有了几个断开的接头,入口处的几块石头开始松动,因此将碎屑从旧接头中标记,然后将石头放回新的迫击炮床上,然后向房主展示如何将维修与海绵混合在一起。HomeHome然后,马克通过安装软接头来完成工作。
如何修复石板台阶
- 用锤子和冷凿子打破宽松的石头周围的砂浆键。握住凿子直立,用锤子撞击屁股以压碎关节。松开后,将凿子滑动在石板下,然后将其从关节中取出。
- 使用凿子和锤子去除现有的砂浆床。另外,取下边界石头周围的任何砂浆。用砌体刷或刚硬的毛刷清除任何灰尘和松散的砂砾。
- Pour the mortar mix into the mortar trough. Add water according to the manufacturer’s instructions and carefully mix the water and mortar together. Work slowly to prevent kicking up too much dust. Tip: Add slightly less water than the manufacturer suggests at first, slowly adding more water until the mortar has a stiff oatmeal-like consistency.
- 将混凝土粘合剂涂在现有混凝土上,以确保现有混凝土不会太快地从砂浆中拉出所有水分。将其涂在表面和边缘of the existing stone and mortar so everything can bond together.
- 将砂浆混合到地板上。用边缘创建犁沟masonry trowel通过以一定角度轻轻向下按直至形成小脊。确保工作砂浆,直到与框架结束,以确保具有牢固的纽带。
- 将田野石头放入砂浆床中,然后将其扭动到位,使其与现有地板相同。这可能会将迫击炮推向石头边缘。用抹子去除多余的灰浆。如果石头处于台阶的边缘,请在石头下面打包砂浆混合物,请小心不要在它有机会设置之前提起它。
- Use the sponge, a bit of water, and light pressure to remove the mortar from the top of the stones and also to smooth the mortar joints. This will pull the sand aggregate up from the joint, giving it a rougher look that fits in with the existing floor. Repeat as many times as necessary.
- If the repair butts up to a wood structure, such as a stair riser, install a “soft joint.” Tape along the edge of the joint and the bottom of the wood. Squeeze the caulk into the joint. Use a bit of洗碗剂在食指的垫子上,沿着填缝剂将其拖动以使其平滑。取下胶带,使其干燥,然后涂填充填缝剂。
- 修复疗法(大约28天)后,将砌体密封剂涂在地板上protect它使地板有些流行和闪耀。
资源
Mark makes repairs to a 1960s flagstone entryway to ensure it’s safe and long-lasting. To address the
马克建议在地下室楼梯的顶部放松石头,并用手轻轻拆除任何松散的石头碎片和灰浆。
跟进使用chiselandhammer打破旧的砂浆以释放大型石板碎片。用一个砌体刷to clear any dirt or debris. For indoor masonry projects Mark recommends using aType S mortar premix这只需要加水。
对于较小的维修工作,可以将砂浆批量混合在橡胶混合浴缸根据需要少量。在使用灰浆床后镘, 添加construction adhesive在将石头放在原位之前,请先进入石头的底部。粘合剂将随着迫击炮固定而增强键。
要解决石板地板和楼梯立管之间的差距,请使用硅胶填缝. Mark recommends dipping your finger in蓝盘液体在平滑填缝缝之前。此技巧将有助于创建无缝的饰面。